ONE-STOP SOLUTION FOR CEILING, WALL AND FLOOR SYSTEMS.
Loading...
FIBER CEMENT BOARD (GREY)

1. support span, good stability;
2. rails and outer body materials imported stainless steel, the overall layout of coordination, beautiful
3. The use of multiple sets of protective devices and emergency measures, the use of safe and reliable;
The platform flexible structure, fully meet the convenience of docking with the aircraft door;
5. The structure of friction at all high-quality materials, good appearance;
6. stepladder with a special non-slip aluminum special, not only elegant appearance, and excellent non-slip effect

  • Product Detail
  • Inquiry

Main Characteristic

1. 100% Asbestos Free
2. Excellent Fire Resistant
3. Excellent Moisture / Water Resistant
4. Good Heat and Sound Insulation
5. High Strength
6. Stable Dimensions
7. Durability and long service life
Production Process

Product packaging
Size
(MM)
Thickness
(MM)
Weight
(KGS)
Loading Quantity Per 20GP
(PCS)
1220x2440
6
24
900
1220x2440
8
32
700
1220x2440
9
36
600
1220x2440
10
40
540
1220x2440
12
48
450
1220x2440
15
60
360
1220x2440
18
72
300
Installation

Partition Installing Method

1. Galvanized Metal Frame
a.The top and bottom keels are fixed respectively top floor and on floor with expansion bolts.
b.The vertical keel should be aligned well according to the requirement (generally being 612 mm) with
laterally supporting keel installed.

2. Board Material Package Fixed
a.Cutting the board material to the dimensions needed (about 10mm lower than wall height)
b.Board material is fixed on keel in anchoring seam way with tapping screw: the interval of tapping screw is generally
about 200~250mm with screws sinking 0.5mm under the board face.
c.The expansion seam of about 4mm between boards should be kept.
d.The shrouding should be fixed from the middle to the four sides and cannot be operated at multipoint simultaneously
to avoid generating inner stress to make board material bucking.
e.Before board being packaged and fixed, depending the needs, glass cotton or rock cotton can be filled.

Ceiling Installing Method

1.Carry out ceiling line-measuring to determine the ceiling’s fixed position, the boom’s central range is generally 1200.
2.Connect and fix the boom and main keel with hanging piece to make the main keel keep level position.
3.Vertically fix the sub-keel to the main keel with hanging piece; the sub-keel axis’central range is 612mm.
4.Install the laterally supporting keel properly, its central ranges is 1224mm.
5.Fix the board on sub-keels with tapping screws, and to well the seam-connecting treatment.

Notice:
The hanging system of TITAN board combined with light steel keel is divided into two kinds of person-standing type
and non person-standing type; for the non person-standing type,only consider the self-weight of ceiling and light.Lamp
without loading other loads; for the person-standing type. Consider about 80~100kg load when someone repaired it.
Product Application
Company Profile
Product name:     *
name:     *
mobile:     *
tel:   
fax:   
Email:    *
Address:   
Content:     *